Installation Industrial Ventilation
, Smoke Extraction & Air Extraction in Morocco
in industrial ventilation, CMV and ERP smoke extraction in Morocco. Air extraction, industrial dedusting and air treatment compliant with standards. 400°C/2h fire-rated ducts. Free quote within 24h.

Industrial Ventilation & Smoke Extraction Solutions in Morocco
FCE designs and installs all your aeraulic systems: industrial ventilation, CMV, ERP smoke extraction and air extraction, from thermal study to preventive maintenance and repair throughout Morocco.
Industrial Ventilation & CMV
Air extraction, fresh air supply and aeraulic balancing for warehouses, factories and car parks. Design of duct networks and single or double flow industrial CMV compliant with Moroccan standards.
Dedusting & Air Treatment
Industrial filtration, dedusting, humidity control and UV disinfection for a healthy, safe and HACCP-compliant indoor environment in your industrial and commercial premises.
Smoke Extraction ERP/ERT 400°C/2h
Fire safety of ERP/ERT buildings with mechanical or natural smoke extraction, 400°C/2h fire-rated ducts and approved motors. Full compliance with Moroccan and European regulatory requirements.
Certified Ventilation Equipment
Sale and installation of extraction roof fans, ventilation boxes, single and double flow CMV, custom duct networks and aeraulic systems — all certified brands.
Industrial Dedusting & Custom Air Extraction
The efficient extraction of fine particles, smoke, solvents and pollutants is a vital issue in industry. Our design office precisely sizes industrial ventilation, CMV and ERP smoke extraction networks to meet the demands of your production: food processing, metallurgical, chemical, pharmaceutical or naval in Morocco.
- Design and installation of aeraulic duct networks
- Single and double flow industrial CMV
- Mechanical & natural ERP/ERT smoke extraction 400°C/2h
- Industrial dedusting and particle filtration
- Air extraction for professional kitchens
- Maintenance, repair and service contracts
- Air renewal for underground car parks
- Air treatment for laboratories and cleanrooms
Standards & Fire Safety
Fire-rated ducts and approved motors for 400°C/2h smoke extraction. ERP, ERT and Moroccan standards compliance guaranteed.

Complete Guide: Industrial Ventilation & Smoke Extraction in Morocco
Discover our complete catalog of industrial ventilation, CMV, ERP smoke extraction and air extraction: extraction roof fans, boxes, 400°C/2h fire-rated ducts, technical specs and client references in Morocco.
Industrial Ventilation & Smoke Extraction throughout Morocco
Our certified engineers in industrial ventilation, CMV, ERP smoke extraction and air extraction serve Casablanca, Rabat, Marrakech, Tangier, Agadir, Fès and all industrial zones in Morocco. ERP aeraulic compliance, free quote within 24h.
What is industrial ventilation for?
Industrial ventilation covers the installations that renew, extract and treat air in commercial and industrial premises. It answers three distinct needs that are often confused.
Workplace hygiene and health: removing stale air, dust, vapours and process odours, and introducing enough fresh air. Fire safety: smoke extraction, which clears smoke and hot gases to keep escape routes usable — in buildings open to the public this is a regulatory obligation, not a choice. Building performance: controlling humidity, preventing condensation and protecting both the structure and the equipment.
These three functions do not call for the same equipment, the same materials or the same inspections.
Types of ventilation installation
| Solution | Function | Typical application |
|---|---|---|
| Single-flow MVHR | Stale air extraction | Offices, sanitary facilities, small workshops |
| Double-flow MVHR | Extraction and supply with heat recovery | Offices, densely occupied buildings |
| Workshop air extraction | Removal of process pollutants | Industry, workshops, commercial kitchens |
| Industrial dust extraction | Capture of particles at source | Food processing, wood, metalwork, minerals |
| Mechanical smoke extraction | Smoke removal in case of fire | Public buildings, car parks, warehouses |
| Natural smoke extraction | Roof vents and low air inlets | Warehouses, industrial buildings |
| Air treatment | Filtration, humidification, dehumidification | Cleanrooms, pharmaceuticals, food processing |
| Air curtains | Thermal barrier at openings | Shop entrances, loading bays |
Smoke extraction: an obligation, not an option
In buildings open to the public and workplaces, smoke extraction has a precise purpose: keeping escape routes usable long enough for occupants to leave and for the emergency services to intervene.
- Natural extraction: roof vents and low air inlets, requiring no power
- Mechanical extraction: extract fans operating in a hot atmosphere
- 400 °C / 2 h rating: the fan keeps running for two hours in 400 °C smoke
- Sizing based on area, ceiling height and smoke compartmentation
- Ducts, dampers and fans certified for this duty
- Periodic verification of the installation
Standard ventilation equipment does not meet these requirements. And a smoke extraction system that has never been tested is one nobody knows will work on the day.
How is an installation sized?
Sizing rests on an airflow study, which determines the required flow rates and the pressure losses across the network.
- The volume of the premises and the ceiling height
- The number of occupants and the occupancy profile
- The nature of the pollutants: dust, vapours, heat, humidity, odours
- The regulatory flow rates applicable to the activity
- Network geometry: lengths, bends, sections, materials
- Acoustic constraints, often overlooked yet decisive in offices
Two frequent errors. Undersizing the flow rates: the air is not renewed, pollutants accumulate, the installation fails its purpose. Ignoring pressure losses: the fan does not deliver the flow rate promised on paper, and the gap between study and reality can be considerable.
What determines the budget?
The flow rates to handle
They follow from the airflow study and the applicable regulations. This is the primary factor.
The ductwork
Length, sections, materials, accessibility. In a refurbishment, routing ducts through an existing building often represents a substantial share of the works.
The level of requirement
400 °C/2 h certified smoke extraction, fine filtration or an installation in an explosive atmosphere do not use the same equipment as ordinary extraction.
Heat recovery
A double-flow system costs more to buy and recovers a significant share of the heat in the extracted air. The calculation is made over the operating life.
At handover we provide measured flow readings, network drawings, equipment datasheets and smoke extraction test reports. An unbalanced installation does not deliver the flow rates the study specified.
Every project is quoted after a site visit and airflow study.
Frequently asked questions
Is smoke extraction mandatory?
In buildings open to the public and in workplaces, yes. The obligation and the sizing depend on the type of establishment, its category, its area and its height. We check what applies to your building during the site visit.
What does a 400 °C / 2 h fan mean?
That it is certified to keep running for two hours in smoke at 400 °C. This is the condition for mechanical smoke extraction to do its job during evacuation and emergency intervention. A standard ventilation fan does not meet it.
What is the difference between single and double flow?
Single flow extracts stale air and lets fresh air in through vents. Double flow mechanically supplies filtered fresh air and recovers heat from the extracted air through an exchanger: more efficient, but it needs a second duct network.
How often should a ventilation system be serviced?
At least once a year for an office network, more in dusty or food-processing environments. Smoke extraction installations are subject to specific periodic checks.
Do you work on an existing network?
Yes: diagnosis, flow measurement, cleaning, compliance upgrades, fan replacement or network extension.
Do you measure flow rates at handover?
Yes. Balancing and flow readings are part of commissioning, and the measured values are provided to you.
Do you also handle air conditioning?
Yes, ventilation and air conditioning are often designed together on the same building.
Related solutions
Your industrial ventilation or smoke extraction project in Morocco?
FCE sizes and installs your industrial ventilation, CMV, ERP smoke extraction and air extraction systems in Morocco. Free quote within 24h, certified technicians.

